Castaic, Crafton Hills, and Perris Dams are operated and maintained by the California Department of Water Resources (DWR). California Water Code requires DWR to retain an independent Director’s Safety Review Board (Board) on a five-year cycle to make an independent report to the DWR Director on the operational performance and safety of DWR-owned dams. Marc Ryan, Principal Engineer with Slate, participates on the Board providing engineering review, inspection, and safety evaluation of all project works at the dams.
As an independent consultant for the Board, our services included identifying actual or potential deficiencies, reviewing historical documentation of design, construction, instrumentation, performance, operations, and all other relevant documents as requested. Additionally, we performed an independent inspection, review, and safety evaluation of all the project works.
Slate services:
Technical components:
The role also includes participation on the Consulting Board of Review for the Castaic Dam Modernization. That project potentially includes a new intake structure, new outlet tunnel, new or rebuilt spillway, and a new downstream control structure.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.